File 02: Electricity · Longitudinal Record (2019–2026)
Follow the fuel. Then follow the grid.
Gas dependence, interconnection finance and electricity provision are separate parts of the energy record.
Fuel, finance and implementationLatest supported material · Autumn 2026Latest comparable period · Summer 2026
What This File Documents
Gas dependence, interconnection finance and electricity provision are separate parts of the energy record.
EXPLICITLY IN SCOPE
Fuel, finance and implementation. Documentary history, implementation and evidence limitations.
DELIBERATELY OUTSIDE SCOPE
The Algerian share concerns gas supply, not electricity imported directly from Algeria. Service satisfaction is not an engineering reliability measure.
Current Overview
Latest supported material is Autumn 2026. This is descriptive; it is not a comparison period or an evidence-through date. Latest comparable period: Summer 2026.
Latest comparable observations
FACTComparable observationSummer 2026
Natural Gas Supply & Trans-Med Pipeline Royalties
Algerian gas provides 60–70% of national gas supply; gas fuels ~95% of electricity
65% is share of gas supplied from Algeria; gas generates ~95% of total power.
STEG Notices on Rotating and Intermittent Electricity Interruptions
Official STEG regional notices announced possible rotating and intermittent electricity cuts across multiple districts, conditioned on network stability and the balance between power production and consumption, specifying that individual interruptions would not exceed two hours.
Recorded status: ANNOUNCED. Coordinated operational announcements across Greater Tunis, Northwest, Sfax, and Southern regions; conditioned on grid balance, not a nationwide blackout. Primary institutional source anchored at http://www.steg.com.tn (document-level URL unavailable / institutional provenance anchor).
STEG Notices on Rotating and Intermittent Electricity Interruptions
Official STEG regional notices announced possible rotating and intermittent electricity cuts across multiple districts, conditioned on network stability and the balance between power production and consumption, specifying that individual interruptions would not exceed two hours.
Recorded status: ANNOUNCED. Coordinated operational announcements across Greater Tunis, Northwest, Sfax, and Southern regions; conditioned on grid balance, not a nationwide blackout. Primary institutional source anchored at http://www.steg.com.tn (document-level URL unavailable / institutional provenance anchor).
2019 marks the beginning of Kais Saied’s presidency, not the beginning of these systems or their problems. Preserve the reference period when comparing outcomes.
DATA GAP · A comparable 2019 series is not established by the selected evidence.
Disaggregated Data on Corporate Energy Subsidies and STEG Arrears
Itemized public accounts detailing preferential gas and electricity tariff subsidies allocated to heavy industrial consumers and outstanding unpaid billing arrears by state entities are not published in open disaggregated format.
European Commission Approves €307.6 Million Grant for ELMED Under Connecting Europe Facility (CEF)
The European Commission formally allocated a €307.6 million grant from the Connecting Europe Facility (CEF-Energy) to co-finance the 600 MW, 200 km submarine high-voltage direct current (HVDC) cable connecting Kelibia (Tunisia) to Partanna (Sicily).
World Bank Approves $268.4 Million Financing Package for ELMED
The World Bank Board of Directors approved a $268.4 million loan to the Republic of Tunisia for the Tunisia-Italy Interconnector Project (ELMED), financing the HVDC converter station and grid reinforcement.
The Ministry of Economy and STEG finalized concessional loan agreements with the European Investment Bank (€45M), KfW (€35M), and EBRD, bringing total committed financing for ELMED to ~€850 million.
Launch of Tenders for Converter Stations and Subsea Cable EPC Contracts
STEG and Italian grid operator Terna issued international engineering, procurement, and construction (EPC) tenders for the subsea cable laying and the converter stations in Kelibia and Partanna (target commissioning: 2028).
STEG Notices on Rotating and Intermittent Electricity Interruptions
Official STEG regional notices announced possible rotating and intermittent electricity cuts across multiple districts, conditioned on network stability and the balance between power production and consumption, specifying that individual interruptions would not exceed two hours.
Recorded status: ANNOUNCED. Coordinated operational announcements across Greater Tunis, Northwest, Sfax, and Southern regions; conditioned on grid balance, not a nationwide blackout. Primary institutional source anchored at http://www.steg.com.tn (document-level URL unavailable / institutional provenance anchor).
What financing was mobilized for the €850M ELMED Tunisia–Italy submarine cable, what progress was achieved on renewable generation, and what is Tunisia's continued structural dependence on Algerian gas?
Open the canonical investigation for its complete sequence, financing status, measured outcomes and causal boundaries.
Tunisian Company of Electricity and Gas (STEG) LEAD_AUTHORITY
Statutory national electricity monopoly; co-owner and operator of ELMED with Terna.
Causal boundary: Manages technical procurement, grid stability, and thermal power generation.
Ministry of Finance FINANCING_SOURCE
Sovereign borrower of World Bank/EIB/KfW loans and guarantor of STEG external liabilities.
Causal boundary: Provides sovereign loan backing and covers annual fuel deficit subsidies.
European Union (European Commission & EEAS) FINANCING_SOURCE
Connecting Europe Facility (CEF-Energy) grant agreement governance.
Causal boundary: Provided €307.6M direct grant co-financing for European interconnector status.
What the evidence establishes
ESTABLISHED
Algerian gas provides 60–70% of national gas supply; gas fuels ~95% of electricity Evidence
Official STEG regional notices announced possible rotating and intermittent electricity cuts across multiple districts, conditioned on network stability and the balance between power production and consumption, specifying that individual interruptions would not exceed two hours. Evidence
NOT ESTABLISHED
The Algerian share concerns gas supply, not electricity imported directly from Algeria. Service satisfaction is not an engineering reliability measure.
DATA GAP
Detailed financial settlements of in-kind royalty gas volumes from the Enrico Mattei (Trans-Med) pipeline and STEG's commercial cross-debt balances with Sonatrach are not fully published in open budget annexes. Inventory record
No comparable 2019–2026 outage-duration, tariff or grid-reliability series is linked in this dossier. Financing does not establish commissioned capacity. Inventory record
Data gaps
DATA GAPDATA_GAP2026-06-30 · ISS-ELECTRICITY-05
Commercial Terms of Trans-Med Gas Royalties and STEG Arrears Balance Withheld
Detailed financial settlements of in-kind royalty gas volumes from the Enrico Mattei (Trans-Med) pipeline and STEG's commercial cross-debt balances with Sonatrach are not fully published in open budget annexes.
Gas subsidy line items are aggregated without transparent unit cost and import price formula disclosures.
No comparable 2019–2026 outage-duration, tariff or grid-reliability series is linked in this dossier. Financing does not establish commissioned capacity.
This is a bounded inventory gap, not a claim that no such data exists anywhere.
Canonical provenance is preserved. A named document without a direct URL is identified as such; it is not presented as newly retrieved or independently verified.
If you possess official documents, internal logs, data records, or corroborated evidence regarding public infrastructure, procurement, or environmental violations in Tunisia: